The site is in test mode

Tashkent region, Kibray district, Power Plant street 296 info@uzbekenergotamir.uz
Sitemap (1100)(+998 55) 508-89-98

Quality policy

Filter by name

629207_Installation and repair of steam-air boilers 506.21 KB pdf
629208_Pressure vessels 554.21 KB pdf
635170_Inspection and testing of technical devices and structures 469.15 KB pdf
712550_Installation and repair of permanently installed overhead cranes 498.72 KB pdf
265424_Adjustment of electrical installations 807.36 KB pdf
265425_Chemical protection 468.73 KB pdf
445321_Underground gas pipelines 485.96 KB pdf
445327_Above-ground gas pipelines 486.45 KB pdf
ML.1523_Certificate of approval of LNK 203.29 KB pdf
182174_Design, construction, operation of facilities 1.25 MB pdf
216063_Repair of compressors and pumps and equipment 527.62 KB pdf
552713_Repair of control and shut-off valves 490.12 KB pdf
ISM POLICY dated 11/01/2023 (2) 524.49 KB pdf